Fourth lock at Lanaye
Construction of a class VIb lock (225 m – 25 m – 13.7 m), a road bridge (210 m long and 15 m wide) and a road tunnel (150 m long), a pumping station /hydroelectric plant and a collection of additional works within an operating lock complex.
Tourist development through landscaping of the site and the construction of service infrastructures for public use. Studies in association with a landscape architect, a sculptor and an artist.
Mission
Complete architecture, stability, special techniques, electromechanical engineering and landscaping mission: preliminary design, basic design, tender documentation, detailed design, site supervision, assistance to the acceptance of the works