Wandre Bridge at Liege
Cable-stayed bridge with central cable plane and inversed Y-shap pylon over the Albert canal and the river Meuse. The prestressed concrete box girder have been launched over the waterways.
Mission
Complete mission of stability and architecture : preliminary and definitive projects, execution project including the execution methods