Pays de Liège bridge
Cable stayed bridge for an urban motorway composed of :
- a single pylon shaped as a truncated cone and covered with glass plates,
- central cables sheathed with stainless steel,
- a prestressed concrete deck with a central box-girder and side slabs bearing on steel rods sheathed with stainless steel.
The deck is 25.7 m wide, the main span across the Meuse river is 162 m long for an overall length of 327 m.
The first part of the tunnel acts as a counterbalancing span.
Mission
Complete mission : preliminary studies and architectural concept ; definitive and execution studies ; supervision on the site ; architectural concept