Main sewage in Seraing

    Main sewage in Seraing

    Flood protection collection of Cockerill Street in Seraing and refurbishment of pumping stations No. 3, 5, 6 and 8 temporary

    Building of the flood protection collector along Cockerill Street, the new bypass road and the Meuse dock at the bottom of Seraing, including mainly 1.9 km of pipe laying with a very low gradient (0.002 m/m).

    Fiber and electrical links between pumping stations No. 3, 5, 6 and 8temporary in Seraing.

    Upgrading electromechanical equipment and civil engineering of pumping stations No. 3 and 5 in Seraing.

    Building of the temporary pumping station No. 8 in Seraing.

     

    Mission

    Design and direction of works

    • 2 photos