Development of the right bank of the river Meuse near the Charles de Gaulle bridge in Dinant
The study includes :
- the urban development, landscape and technical study of the right bank of the river Meuse over a length of 1.6 km between “Place Albert 1” and the dam bridge,
- the design of an overhanged platform upon the Meuse (width of 3 to 5 m) with integration of a long distance cycle route,
- traffic study with preservation of the parking capacity,
- study of street furniture, terraces, lighting and planted areas,
- study of the impact of the platform “la Croisette” on the flow of the river Meuse in flooding period (with the collaboration of the university of Liège),
- study of mooring places and other facilities for round-trip boats and walkways for passengers.
Mission
Preliminary design, design and drafting of the special specifications