Development of the right bank of the river Meuse near the Charles de Gaulle bridge in Dinant

    Development of the right bank of the river Meuse near the Charles de Gaulle bridge in Dinant

    The study includes :

    • the urban development, landscape and technical study of the right bank of the river Meuse over a length of 1.6 km between “Place Albert 1” and the dam bridge,
    • the design of an overhanged platform upon the Meuse (width of 3 to 5 m) with integration of a long distance cycle route,
    • traffic study with preservation of the parking capacity,
    • study of street furniture, terraces, lighting and planted areas,
    • study of the impact of the platform “la Croisette” on the flow of the river Meuse in flooding period (with the collaboration of the university of Liège),
    • study of mooring places and other facilities for round-trip boats and walkways for passengers.

    Mission

    Preliminary design, design and drafting of the special specifications

    • 4 photos