Inauguration of a new loading dock of the platform of Pecq

    Inauguration on Wednesday June 1, 2016 of a new loading dock of the bimodal platform of Pecq (BE).

    This 325 m long quay, situated along the Scheldt, includes an unloading platform of 325 x 17 m² and connection roads.

    Greisch office realised the execution studies and the site supervision.