Once again this year, the greisch engineering office actively took part in organizing the “Build a Bridge” competition. The principle of this fun competition is simple: to design and build, individually or as a team, a model of a bridge structure with a one-meter span. The result must be both strong and aesthetically pleasing.
The first prize for strength-a bridge built by a mixed team from ULiège and the Athénée Royal of Huy-supported a load of 4,723 N!