Laying of the surfacing of the Third Bosporus bridge near Istanbul

    Laying of the surfacing of the Third Bosporus bridge near Istanbul (TR).

    The final stages of completion of the third Bosporus bridge are underway :

    • surfacing,
    • installation of equipment,
    • mounting of the definitive bearings,
    • final adjustments of the cables and installation of the dampers.

    Greisch office achieved the global studies, the static and dynamic (wind, earthquake…) studies of the structure in service and under construction stages and the detailed design of the steel central span.

    Designers: Michel Virlogeux and Jean-François Klein.