Sluice of Papignies
Sluice of Papignies

    Sluice of Papignies

    Studies for replacing the two existing beam structures with a new automatic moving dam, with two 8-metre wide bays.

    Each bay is equipped with a metal sluice gate, itself operated by an oil-hydraulic cylinder.

    The project includes:

    • a set of technical installations housed in a building constructed on the central pier approximately 4 metres wide.
    • a new concrete bridge across the two sections to carry traffic on the Rue de l’Ecluse.
    • the dam, located on a new branch of the river Dendre, almost one kilometre long, will have:
      • an upstream channel constructed with sheet pilings under the flotation level, with plantable gabions on top,
      • a downstream trapezoidal channel designed with revetments and plantable gabions.

    The presence of a thick layer of peat makes the geotechnical context problematic. For this reason, the dam is set on concrete piles.

    Mission

    Mission preliminary design, building permit, design and H&S coordination (on behalf of SPW). Construction designs (on behalf of the contractor)