Logo bureau Greisch
1959 - 2009
 
 

work owner
Rijkswaterstaat (Dutch ministry of public works)

realization
for 2009.

works costs
120 000 000 euros excl. vat. for the repair works of the bridge decks and the reinforcement with a concrete layer, excluding the potential structural reinforcement of the steel structure

location
Muiden, Elsloo, Beek-Geleen, Kreekrak, Utrecht, Ewijk, van Brienenoord, Oostvoorne (NL)

mission
Survey mission for the engineering consortium Royal Haskoning, Arup, Greisch


introduction activities projects news contact job

Renovation of eight steel bridges in the Netherlands

Along the main roads of the dutch highway network, some bridges have fatigue problems, mostly on their decks. Rijkswaterstaat has developped a structural solution for the bridges with an orthotropic steel deck consisting, after repair, of the reinforcement of the deck with a very high resistant concrete slab 60 mm thick to create a composite behaviour.
The mission of the engineering consortium concerns the eight following bridges : Muiderbrug, Scharbergbrug, a bowstring bridge near Beek, Kreekrakbrug, Galecopperbrug, Waalbrug at Ewijk, the second Brienenoordbrug and Suurhoffbrug.
The mission covers the engineering and the complete project management, including bridge inspection, calculation, design, preparing contract documents and supervision of the execution of the works.
Each bridge is recalculated in accordance with the latest load and calculation standards. The definitive load combinations are determined in deliberation with the ministry, in function of the traffic forecasts and the additionnal costs for the upleveling.
The whole main structure is checked to resistance as to fatigue, and the required reinforcement mea-sures are determined.

Renovation of eight steel bridges in the Netherlands  Print version
Press release Press release