Multimodal platform at Hermalle-sous-Argenteau This platform for harbour exploitation contains railways, tracks for portal cranes, local roads and their equipment, the collecting, the raising with two pump stations (2 400 and 3 600 l/s) and the removal of surface water, and an isolation zone.
The project integrates the environmental and urbanistic aspects.
Related project
 |