Logo bureau Greisch
 
 

work owner
Service public Wallonie, direction des routes de Charleroi (Public agency Wallonia, direction of roads of Charleroi / SPW - DGO1 - DRHBW - DRC)

architect
bureau greisch

realization
in 2004

works costs
200 000 euros excl. vat

location
Farciennes (BE)
> Google Maps

mission
complete mission

activity fields
> bridges


introduction activities projects news contact job

Footbridge of Farciennes

This footbridge is aimed to recreate an access to a forest that has been closed by the construction of a junction of motorways. The bridge is made of Corten steel.
The material choice gives a simple and durable answer to this link in a wooden area, that does not need any maintenance.
The structure, a 200 x 25 cm box-girder lies on its ends and at mid-span with lengts of +/- 20 m. All pieces - box-girder, parapet, steps, piles - have been made of on single coil, 2 m wide and 8 mm thick, unrolled and cut.

Footbridge of Farciennes  Print version