Logo bureau Greisch
 
 

work owner
SOFICO.

architect
bureau d'études Greisch.

realization
from 1999 to 2000.

works costs
744 000 euros excl. vta.

location
over the canal of the Ourthe at Liège (BE).
> Google Maps

mission
complete mission of conception (architecture, stability and techniques), of coordination of the equipments and technical assistance by the works.

activity fields
> bridges


introduction activities projects news contact job

Link E40-E25 - footbridge of Aguesses

Movable steel footbridge 22,50 m long and 5,25 m wide.
The boxes of the girder, the pylon and the counterweight form the main structure which eccentric on the side of the bridge. The three cables sheathed with stainless steel are the length of the counterweight. The deck is composed of thick wooden pieces.
The manoeuvre of the bridge is leaded by a hydraulic jack under the foot of the pylon.

Related projects
> Link E40-E25 - tunnel of Kinkempois and open trench
> Link E40-E25 - tunnel and interchange of Grosses Battes
> Link E40-E25 - the surroundings
> Link E40-E25 - bridge of Pays de Liège


Link E40-E25 - footbridge of Aguesses  Print version