Youth hostel - Retaining wall Executed before the construction of the building.
The reinforcement of the existing retaining wall (10-14 m high, 45 m long) of heavily damaged masonry has been realized by cleaning up, injection and consolidation through anchorages and apparent
distribution plates in cast iron ; a part of the wall has been underpinned.
The demolition of different existing buildings, simultaneously to the realisation of a concrete retaining wall 12 m high and 40 m long per descending stages with horizontal anchorages, needed to support temporary the ground with vertical micro-piles.