Liège-Airport - lengthening of the runway The project contains following works :
- the lenghtening of the runway (length 413 m, width 45 m + shoulders) to allow the take-off of the heavy freight cargos,
- the lengthening of the taxiway to allow for a direct access to the new end of the runway and to avoid movement on the runway,
- the de-icing / anti-icing zone for de-icing of airplanes just before their take-off.
Those works made some arrangements in and outside the airport necessary : the modification of the balisage of the runway, the design of a new sewage system and a storm basin of 30 000 m³ with complete treatment of the discharge products, the modification of the public outlying road, the tunneling of a railroad in front of the runway, the realisation of earthwork and noise barriers along the new road N 637.