work owner
TNT express worldwide

architect
Canevas

realization
from 2006 to 2008.

works costs
14 500 000 euros excl. vat

location
Bierset, Grace-Hollogne (BE)
> Google Maps

mission
complete mission for stability and building techniques

activity fields
> technical equipment


introduction activities projects news contact job

Liège Airport - extension of the hub of TNT

Expansion of the existing building with a construction containing a sorting zone 191 m x 93 m and a technical zone 22 m x 93 m.
This building is equiped with a surveillance system with cameras, an internal data network (optical fibers and cables cat. 6), systems for access control, fire detection and intrusion detection. Electricity is supplied by a high tension cabin with two transformers 1 250 kVA. A No-break group of 1 250 kVA protects the installation against interruption.
Lighting is realised with fluorescent lamps with electronic ballast.
The installation is completed with a 1 ton goods lift and a bridge crane of 15 tons.
The sorting zone is heated with gas radiant panels. It is equiped with a smoke exhaust system and a ventilation system.
The technical zone, workshop and storage, is warmed by unit heaters and gas radiant panels. It is ventilated with roofopenings and ventilation groups.
The whole site is equiped with a optical fiber network linking the different buildings.